Check throughout the work hypothesis, minutes① scene conducted by TBM → Operation information and spread the risk factors.② check target verification→ Check the locking device→ Check the zoning
to check the hypothesis, the current distributorthe implementation of the TBM ①the content of → spread and risk factorsthe ② check checkplease check the → strong value→ zoning configuration check