Amid a TRAY ceiling installation ① TBM and ready to work → Personal protection wear and health condition check② prepare the draft resolution and materials→ Loaded over ban overcharging and 2M→ 4-signed band for the installation and avoid fallingThe clean-up is in charge of internal materials, launch: FAB → batch
đang được dịch, vui lòng đợi..